Recent project experience includes:
Oxford Avenue Watermain Extension
City of Edina, MN
This directional drilling project included approximately 600 ft. of watermain installation through difficult terrain in a residential area requiring both drastic vertical and horizontal alignment changes. Construction document preparation included development of City Standard Specification for directional drilling.
BC7 & BC8 Trunk Sanitary Sewer, Lift Station, Street, and Watermain Improvements
City of Chanhassen, MN
This project included 2100 ft. of directional drilling as well as 8300 ft. of open cut sanitary sewer and watermain in an environmentally sensitive area. The project also included street restoration and upgrades, coordination with Mn/DOT and future developments, neighborhood meetings, and extensive easement acquisition.
Lake Minnewashta Watermain Loop
City of Chanhassen, MN
Approximately 2200 ft. of directionally drilled trunk watermain through protected wetlands along the edge of Lake Minnewashta and State Highway 5.
Pioneer Trail / Flying Cloud Drive Sanitary Sewer and Watermain Improvements
City of Eden Prairie, MN
TH 212 and CSAH 1 trunk utilities project included 640 ft of directional drilled sanitary sewer down a wooded slope and beneath Purgatory Creek to an interceptor sewer. Project management included Mn/DOT, County, and MCES permitting as well as MAC and future site development coordination.
King Park
City of Lakeville, MN
Construction staking for water and sewer lines and directional drilling of sanitary line and water service.